Skip to content
GAIAA, Intelligence, engineered
Solutions
Solutions overviewBuild, deploy and improve AI systems that deliver real value.Private AI infrastructureRun private AI securely in your infrastructure.Existing AI optimizationMake existing AI faster, more reliable and more valuable.
Main specializations
Computer VisionSmart CityLIMSIndustrial IoT
IndustriesCase StudiesAbout usBlogContact
ENPL
Solutions
Solutions overviewPrivate AI infrastructureExisting AI optimization
Main specializations
Computer VisionSmart CityLIMSIndustrial IoT
IndustriesCase StudiesAbout usBlogContact
ENPL
GAIAA, Intelligence, engineered

Your signals, systems and constraints become the starting point for AI that can work in the real world.

Solutions overviewIndustriesCase StudiesAbout usBlogContact

Bring a process, signal or recurring decision.

Start the conversation
GAIAA sp. z o.o. sp.k.
ul. Sofoklesa 17
60-461 Poznań, Poland
NIP: 7811993317
KRS: 0000777888
© 2026 GAIAAPrivacy policyhello@gaiaa.eu+48 666 308 008LinkedIn
ENPL

Case study: Laboratories & science

Available does not always mean ready.

Equipment readiness became an explainable decision across state, capability, people, time and materials.

SystemOutcomesRelated workDiscuss your case

System

The project and the problem

Before releasing a laboratory operation, planners had to find equipment, a qualified operator, a valid time window and the required material lot. An empty calendar slot was insufficient: the machine also had to be operational, capable, calibrated and outside maintenance, while the operator's qualification and the material's quantity and expiry had to remain valid through execution.

How the process worked

The planner evaluated the released operation against time-bounded equipment, operator, reservation and material evidence as one deterministic constraint set. It returned READY or NOT READY with specific reasons, searched for the earliest combination that satisfied every hard rule and reserved equipment, people and material together to avoid a partial plan.

Resource readiness planner

Find the earliest plan that can actually run.

Use the controls below to inspect the key stages, constraints and validation decisions in that process.

Resource readiness planner

WO-1214 · ALD deposition for S-2197-A to D

EXP-263 · ALD-R12 v3 · needed by 31 Aug · 15:00 CEST

BLOCKED · 2 CONSTRAINTSEvaluated 31 Aug · 08:35 CEST
Requested
09:00 to 11:30
Duration
02:30
Process
Thermal ALD · TMA/H₂O
Carrier
200 mm
Compatible chambers

Candidate equipment

Evaluated allocation

Why the requested plan is blocked

Schedule · 31 Aug 2026
08:0009:0010:0011:0012:0013:0014:0015:00
ALD-03WO-1209Requested10:45 to 13:15
  • Equipment✓PASSChamber check CHK-8842 · no alarms · 08:32
  • Capability✓PASSQUAL-ALD03-R12 · thermal ALD · 200 mm carrier
  • Time!BLOCKEDWO-1209 and clean-down occupy the chamber until 10:45
  • People!BLOCKEDA. Kowalski · ALD-L2 qualification expired 29 Aug
  • Calibration✓PASSCAL-ALD03-2681 · valid through 31 Aug 18:00
  • Maintenance✓PASSPM-ALD03-0904 due 4 Sep · no overlap
  • Materials✓PASSTMA-26-081 · 430 g available / 180 g required · QA released
Earliest valid alternative

10:45 to 13:15

READY TO RESERVE
Equipment
ALD-03
Operator
M. Zielińska · OP-017
Qualification
ALD-L2 · valid through 30 Nov
Materials
Same released lots
Change summary

Start moves 1 h 45 min · qualified operator reassigned.

Meets the 15:00 requirement

Nothing is reserved until you confirm.

Work order
WO-1214
Recipe
ALD-R12 v3
State
CHK-8842
Calibration
CAL-ALD03-2681
Material
TMA-26-081

Every readiness decision resolves to named evidence and a point in time.

Outcomes

Operating constraints

  1. Qualification scope and expiry
  2. Reservation and clean-down conflicts
  3. Calibration valid through execution
  4. Released material quantity and expiry

What changed?

  1. Evidence-backed readiness decisions
  2. Conflicts explained before dispatch
  3. Earliest valid plans
  4. Atomic equipment, operator and material reservation

Evidence retained: Every readiness decision listed the equipment, operator, time and material checks that passed or blocked release.